Final Public Notice for the HMGP-4764-ME City of Bath Hunt Street Pump Station application.
Combined Sewer Overflow Separation Projects
The City of Bath will be conducting sewer main upgrades on Harward Street as part of the Combined Sewer Overflow (CSO) Separation Project. The Harward drainage area, the largest part of the Bath sewage system, consistently sees overflow problems in times when heavy rainfall outpaces the Water Pollution Control Facility's ability to pump out and treat the storm water and sewage .
The CSO Separation Project aims to improve Bath's aging sewer infrastructure by separating combined sewer lines (carrying both wastewater and storm water) to reduce the risk of overflow during heavy rain, ensuring cleaner water and safer storm water management. The image on the left represents our current sewer system (Combined) and the image on the right is what we will have once this project is completed. As you can see this separates our sewage from our storm water which will eliminate contaminated overflow during heavy storms
During this period, you may notice some of the following: